One site record. Three reports that read from it, and never disagree about what it says.

Sample project
Northgate Exchange
Reporting period
July 2026
Contains
Daily, weekly, monthly
Status
Illustrative sample

The live demo

Three reports, one record

The demo runs on Northgate Exchange, a fictitious project. Every figure the daily record can answer is a window over it, so those numbers can only be wrong in one place. The rest come from the cost report, the programme and the registers — the section below marks which is which, one section at a time.

Every site day

Daily

The capture layer. The site team enters the day once, from a phone, and the record is closed. Everything above reads it.

  • Progress planned against actual
  • Manpower, plant and weather
  • Constraints and photographs
Open the daily

Monday to Sunday

Weekly

A full site week rolled up, plus what moved in the registers, issued the following Wednesday.

  • Progress trend and shortfall
  • Register movement and variance
  • Decisions owed, two week look ahead
Open the weekly

Month end

Monthly

Four to five weeks rolled up into trend, cost and forecast. The report the board reads.

  • S curve, actual against plan
  • Cost plan, cash flow, handover drift
  • RAG, value engineering, procurement
Open the monthly
Client cut Daily Weekly Monthly

Where it starts

How the record gets in

Before any of those three reports exists, somebody stands at the gate at the end of the shift and enters the day. One entry, about five minutes, on a phone. That entry is the record — everything above it is a window over the same rows.

Northgate Exchange Day 168
Report date
Friday 12 June 2026
Progress
Cumulative actual44.00%
Cumulative planned47.00%
Activities today
Core wall reinforcement12 / 16 t
Transfer-slab formwork0 / 180 m²
Blinding, waterproofing395 / 380 m²
Manpower
Direct · indirect148 · 23
Conditions
WeatherOvercast, 27°C
Rain hours1.5
Equipment
Excavators · cranes · pumps3 · 2 · 2
Delays and issues
L3 transfer-slab details still outstanding. Formwork crew stood down at 09:00.
Photographs
Submit the day17:35 · site team

Every field on that screen is a column Cadence reads by name. Nothing is retyped afterwards: the same entry is the daily report the same evening, part of Wednesday's weekly, and part of the month-end pack.

Same eveningDaily

The entry, formatted and issued. Four of its six sections are the record itself.

WednesdayWeekly

The week's records, summed and trended. The charts plot them; nobody rebuilds them.

Month endMonthly

Four to five weeks of the same rows, under the cost and programme picture.

Said plainly: capture runs on the site app that feeds Cadence, not inside Cadence. The screen above is drawn to that app's field set rather than photographed from it, because Cadence reads the daily record — it does not collect it. If you already run a daily return, Cadence reads yours.

What that entry cannot answer

Everything on it is something somebody on site saw. A monthly also carries figures nobody on site holds:

  • Cost plan progression, cash flow and the variation position
  • Programme forecast, milestone slip and the critical path
  • Register movement — RFI, RFA, NCR, permits
  • Every RAG call, the watchlist and the value engineering register

None of that rolls up from a daily return, here or anywhere else. The next section marks all 39 sections for which do and which do not.

The part most decks leave out

Capture once. Report three ways. For the half that rolls up.

Of the 39 sections across the three reports, 8 are written by the daily record itself. The rest are judgement or belong to another document, and no reporting tool changes that. Here is which is which, section by section, so nothing in the demo or the pack has to be taken on trust.

8 sections Derived

Computed from the daily records in the period. Nobody types them, and they cannot disagree with each other, because they are the same rows.

10 sections Authored

Judgement — the RAG call, the watchlist, the narrative. Written once, in the report that owns it, instead of three times in three documents that drift.

14 sections Imported

Owned by the cost report, the programme or a register. Cadence renders them. Today they are keyed in at report time — this is not a live feed and is not sold as one.

7 sections Mixed

A derived figure sitting beside an imported or authored one — where a reader is most likely to assume the whole section rolled up. Each is split out below.

Weekly — 10 sections
#SectionSourceWhich part
01The week at a glanceDerivedThe week's daily records, summed and trended.
02Status by workstreamAuthoredEvery RAG letter and every "what changed" line is a call.
03Decisions we needAuthoredIncluding the date each one stops being cheap.
04Register movementImportedRFI, RFA, NCR and permit registers, each owned in its own tracker.
05Progress and productivityMixedActual series derived; the planned series imported from the programme.
06Where the week wentAuthoredAggregates the daily attribution, which is itself a judgement.
07Site photographsDerivedThe week's daily photographs. Nothing re-collected.
08Critical pathImportedFrom the programme file.
09Commercial positionImportedFrom the cost report and the current valuation.
10Look ahead, two weeksMixedActivities imported from the programme; the commentary authored.
Monthly — 23 sections
#SectionSourceWhich part
01Headline KPIsMixedProgress derived; budget, opening date and package award imported; four tiles are calls.
02Percent-of-completionMixedProgress POC derived; financial and per-package POC from the cost report.
03Construction snapshotMixedMajor works derived from the month's dailies; constraints and risks authored.
04Site photographsDerivedThe month's daily photographs.
05RFIs and RFAsImportedThe RFI/RFA tracker.
06Permits, safety, qualityMixedSafety and manhours derived from the daily; permits from the statutory tracker.
07RAG matrixAuthoredThe most-read tile in the report, and not one character of it rolls up.
08WatchlistAuthoredWhat counts as critical is a decision, not a query.
09High-level scheduleImportedThe programme file, forecast against baseline.
10Milestone varianceImportedTwo issues of the programme, differenced.
11Opening date movementMixedDates imported from successive programme issues; the reason authored.
12Where design is slippingImportedThe design tracker.
13Discipline statusImportedThe design tracker.
14Design impact scenariosAuthoredWhat a day of slip costs downstream is modelling, not a record.
15Cost plan progressionImportedSuccessive cost plan iterations, from the cost report.
16Open design decisionsImportedThe design authority's own running memo.
17VE registerAuthoredMaintained by the CM team; every saving band is an estimate.
18VE driven by designAuthoredA filter over the same authored register.
19Cost summaryImportedApproved, awarded, variations, anticipated final — all from the cost report.
20Billing, contractorsImportedCertified payment applications.
21Recent paymentsImportedCertificates issued this period.
22Procurement and consultantsImportedThe procurement tracker and the professional-fees pool.
23Next actionsAuthoredOwner, action, date.
Daily — 6 sections
#SectionSourceWhich part
01The day at a glanceDerivedThe day's entry, totalled.
02Work completed todayCapturedActivity, zone, planned, actual. This is the entry.
03Conditions and plantCapturedWeather, rain hours, equipment on site.
04Constraints raised todayCapturedThe constraint and its owner.
05Why the day landed thereAuthoredThe site manager's read of the day. Dropped from the client cut.
06Site photographsCapturedDated on upload, not at week end.

So the claim, stated exactly: capture the site record once, and the daily, the weekly and the monthly are three windows over it. Everything the record cannot answer is written down once, in one place, instead of three times in three documents that then disagree. That is a smaller promise than "it writes itself", and it is one we can hold to on your project.